How do I find builders and budget for renovating a house in Opio?

Short answer

Renovating an Opio villa starts with the local plan revised in January 2026: in the low-density zones buildings may cover only 8% to 14% of the plot, so extensions are limited even on large plots.

  • Ask for written, itemised quotes (devis) from at least two or three firms. Any builder working on the structure must hold ten-year liability insurance (assurance décennale), and the certificate must be attached to the quote and the invoice: check it covers the trade in question.
  • Work on a home finished more than two years ago is charged at 10% VAT instead of 20%, or 5.5% for qualifying energy-saving work such as insulation or a heat pump. Since March 2025 you no longer sign a separate certificate: the conditions are stated on the quote or invoice.
  • Check planning rules before you budget: extensions, pools, new windows and roofs can need permission, and Opio has its own local plan and fire-risk rules.
Builder's compulsory liability cover
10 years
VAT on renovation of homes over 2 years old
10%
VAT on qualifying energy work
5.5%

Checked 28 November 2026 · Sources: Service Public (ten-year builder's guarantee, checked 10 April 2026; reduced VAT, 2025); impots.gouv.fr. We do not quote cost per m², which varies too much with the house and the finish

Before you sign with a builder
CheckWhy
Itemised written quoteA signed quote is a contract: the invoice must match it
Ten-year insurance certificateCovers defects to the structure for 10 years after handover; must name the trade
VAT rate on the quote10% or 5.5% only if the home is over 2 years old and the work qualifies
Payment scheduleAvoid large payments up front; pay against progress
Planning permissionGet the declaration or permit before work starts
Handover (réception)Record defects in writing; starts the guarantee periods

What you can still do

Interior renovation, energy upgrades and new windows are usually possible with a simple declaration. Pools under 70 m³ do not count towards the footprint. For anything larger, ask for a planning certificate first.

Guarantees after the work

After the handover (réception des travaux), the builder must fix defects reported in the first year, guarantee fitted equipment for two years and cover structural defects for ten years. Keep the quotes, invoices and insurance certificates: you will need them when you sell.

Grants

State renovation grants such as MaPrimeRénov' are mainly for main homes, so second-home owners usually cannot claim them. The reduced VAT rates apply whoever owns the home.

Planning first

See pool and extension rules in Opio and the fire and flood risks, which can restrict what you are allowed to build.

Related questions

Sources

  1. Garantie décennale des constructeurs (Service Public)
  2. Taux réduits de TVA sur les travaux de rénovation : une simple mention suffit (Service Public)
  3. Quel taux de TVA appliquer pour les travaux réalisés dans les logements ? (impots.gouv.fr)