Opio Property

Home › Buying

Can I add a pool or extension to a house in Opio?

Short answer

Often, but Opio's new local plan (PLU), approved on 27 January 2026, is strict. In the low-density residential zones (UC) buildings may cover only 14% of the plot (UCa) or 8% (UCb and UCc), and 80% of the plot must stay unsealed, at least two-thirds of it in open ground.

  • A pool of under 70 m³ does not count towards that footprint in the urban zones, and each plot may have one individual pool of up to 70 m³. In UC, new buildings, annexes and pools must keep 10 m from the boundaries (5 m for an extension of an existing house).
  • In the natural and farming zones (N and A), an existing house of at least 40 m² can be extended only a little (by 40 m² in N, 30% in A), to a maximum of 180 m² of floor area, and annexes and pools together are capped at 60 m², within 20 m of the house.
Maximum footprint, UC zones
8–14%
Minimum unsealed land, UC
80%
Maximum pool volume per plot
70 m³

Checked 28 November 2026 · Source: Opio local plan (PLU), revision no. 1 approved 27 January 2026, règlement. Check the zone of your plot on the Géoportail de l'Urbanisme

Main rules in Opio's residential zones (PLU approved 27 January 2026)
ZoneMaximum footprintMinimum unsealed landFrom boundaries
UBa45%15%5 m
UBb35%40%5 m
UBc10%50%5 m
UCa (low density)14%80%10 m (5 m for extensions)
UCb (low density)8%80%At least 10 m; 30 m in total to opposite side and rear boundaries
UCc (low density)8%; extensions up to 50% of existing footprint80%As UCb
N (natural)Extensions of 40 m², to 180 m² in totalNot setAnnexes and pool within 20 m of the house
A (farming)Extensions of 30%, to 180 m² in totalNot setAnnexes and pool within 20 m of the house

Zone by zone

The denser zones around the village centre (UB) allow more: from 10% of the plot in UBc to 45% in UBa and UBd. Heights in UC are low: 3.5 m to the eaves, or up to 6.5 m to a flat roof and 7.5 m to the ridge where the footprint exceeds 140 m².

Fire zones

The forest-fire plan (PPRIF) applies on top of the local plan and can forbid or restrict building in its most exposed zones. See Opio's wildfire and flood risks.

Permission

A pool of 10 to 100 m² needs a planning declaration (déclaration préalable); larger or covered pools need a building permit. A new pool also brings a one-off development tax: see the rules for owning a pool in Opio.

Related questions

Sources

  1. PLU d'Opio, règlement (révision no. 1 approved 27 January 2026) (Commune d'Opio, via Géoportail de l'Urbanisme)
  2. Géoportail de l'Urbanisme: find your plot's zone (Géoportail de l'Urbanisme)